United States › Grid › Interconnection queues › Massachusetts
OCTARY USA · INTERCONNECTION QUEUESWithdrawn queue requests in Massachusetts — page 3
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Battery Storage Battery storage |
150 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
150 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
150 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
150 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
143 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
142 MW | Withdrawn / abandoned |
| Battery Storage Increase (QP1362) Battery storage |
141 MW | Withdrawn / abandoned |
| Gas Turbine Capacity Increase( #157) Gas |
140 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
134 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
130 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
130 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
122 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
119 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
117 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
116 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
115 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
109 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
108 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
105 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
105 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
105 MW | Withdrawn / abandoned |
| Gas Turbine Gas |
104 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
103 MW | Withdrawn / abandoned |
| Energy Storage Battery storage |
103 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
102 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
101 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
101 MW | Withdrawn / abandoned |
| Battery Storage + Solar Solar + storage |
101 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
100 MW | Withdrawn / abandoned |
| Energy Storage Battery storage |
100 MW | Withdrawn / abandoned |
| Energy Storage Battery storage |
100 MW | Withdrawn / abandoned |
| Gas Turbine Gas |
100 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
100 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
100 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
100 MW | Withdrawn / abandoned |
| Energy Storage Battery storage |
99.9 MW | Withdrawn / abandoned |
| Lowell Power Generators Gas |
99.0 MW | Withdrawn / abandoned |
| Peabody Power Gas |
97.2 MW | Withdrawn / abandoned |
| combustion turbine Gas |
97.0 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
95.0 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
92.4 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
81.0 MW | Withdrawn / abandoned |
| Gas Turbine Gas |
77.0 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
76.0 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
76.0 MW | Withdrawn / abandoned |
| Offshore Wind with battery addition Other |
75.0 MW | Withdrawn / abandoned |
| Powder Mill substation - NG Western MA Area Cluster Study Solar |
70.7 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
69.4 MW | Withdrawn / abandoned |
| Gas Turbine Capacity Increase( #178) Gas |
69.0 MW | Withdrawn / abandoned |
| Combined Cycle GT Gas |
68.0 MW | Withdrawn / abandoned |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)