BATTERY STORAGE · ISO-NE

Battery Storage

Battery Storage is a 119 MW battery storage request withdrawn in the ISO-NE interconnection queue, in Berkshire County, Massachusetts.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Sep 2022 (completed)
  2. Withdrawn / abandonedDec 2023 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
1310
Grid region
ISO-NE (New England)
Connection point (POI)
115 kV Transmission line (1211 - Present between Doreen and Oswald substation)
Location
Berkshire County, Massachusetts
Technology
Battery: 119 MW
Total requested
119 MW
Service type
Network resource (NRIS)
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
23 September 2022
Proposed online date
October 2025
Withdrawn
December 2023

Location

Marker shows the centre of Berkshire County; the queue data does not give exact sites.

Power plants in Massachusetts · Transmission lines in Massachusetts

Other requests in Berkshire County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem