BATTERY STORAGE · ISO-NE

Bear Swamp Pump Load increase

Bear Swamp Pump Load increase is a 333 MW battery storage request built and operating in the ISO-NE interconnection queue, in Berkshire County, Massachusetts.

Queue statusOperating
  1. PlanningQueued May 2022 (completed)
  2. ConsentedJan 2023 (completed)
  3. Construction (completed)
  4. OperatingTarget Jan 2023 (current stage)
  5. Closed (not yet reached)

Request details

Queue ID
1264
Grid region
ISO-NE (New England)
Connection point (POI)
The existing POI of the Bear Swamp generating station.
Location
Berkshire County, Massachusetts
Technology
Other Storage: 333 MW
Total requested
333 MW
Service type
Energy only (ERIS)
Study phase
Executed
Queue status
Operational
Entered queue
19 May 2022
Agreement signed
5 January 2023
Proposed online date
January 2023

Location

Marker shows the centre of Berkshire County; the queue data does not give exact sites.

Power plants in Massachusetts · Transmission lines in Massachusetts

Other requests in Berkshire County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem