Berkshire Wind Power Project is a 15.0 MW onshore wind request built and operating in the ISO-NE interconnection queue, in Berkshire County, Massachusetts, connecting to NU.
Request details
- Queue ID
- 77
- Grid region
- ISO-NE (New England)
- Utility / transmission owner
- NU
- Connection point (POI)
- WMECO at Brodie Mt. In Lanesboro MA
- Location
- Berkshire County, Massachusetts
- Technology
- Wind: 15.0 MW
- Total requested
- 15.0 MW
- Study phase
- IA Executed
- Queue status
- Operational
- Entered queue
- 2 October 2000
- Proposed online date
- May 2011
Location
Marker shows the centre of Berkshire County; the queue data does not give exact sites.
Power plants in Massachusetts · Transmission lines in Massachusetts
Other requests in Berkshire County
- Bear Swamp Unit 1 and 2 UpgradeBattery storage · 66.0 MW · agreement signed
- Berkshire Wind IncreaseOnshore wind · 4.6 MW · agreement signed
- Battery StorageBattery storage · 290 MW · in study
- Battery StorageBattery storage · 170 MW · in study
- Battery StorageBattery storage · 136 MW · in study
- Bear Swamp Pump Load increaseBattery storage · 333 MW · built
- Bear Swamp Pumping Load IncreaseBattery storage · 333 MW · built
- Altresco Increase (winter)Gas · 193 MW · built
- Hoosac Wind ProjectOnshore wind · 28.5 MW · built
- Syncarpha Blandford Solar plus battery storageSolar + storage · 5.0 MW · built
- Bear Swamp Upper Yard substation - NG Western MA Area Cluster StudySolar · 2.5 MW · built
- Glendale Hydroelectric Expansion ProjectHydro · 0.2 MW · built
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem