United States › Grid › Interconnection queues › Massachusetts
BATTERY STORAGE · ISO-NEBattery Storage
Battery Storage is a 290 MW battery storage request in interconnection study in the ISO-NE interconnection queue, in Berkshire County, Massachusetts.
- PlanningQueued Apr 2024 (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Aug 2028 (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- 1515
- Grid region
- ISO-NE (New England)
- Connection point (POI)
- Alps-Berkshire 345kV line
- Location
- Berkshire County, Massachusetts
- Technology
- Battery: 290 MW
- Total requested
- 290 MW
- Service type
- Network resource (NRIS)
- Study phase
- In Progress (unknown study)
- Queue status
- Active
- Entered queue
- 9 April 2024
- Proposed online date
- August 2028
Location
Marker shows the centre of Berkshire County; the queue data does not give exact sites.
Power plants in Massachusetts · Transmission lines in Massachusetts
Other requests in Berkshire County
- Bear Swamp Unit 1 and 2 UpgradeBattery storage · 66.0 MW · agreement signed
- Berkshire Wind IncreaseOnshore wind · 4.6 MW · agreement signed
- Battery StorageBattery storage · 170 MW · in study
- Battery StorageBattery storage · 136 MW · in study
- Bear Swamp Pump Load increaseBattery storage · 333 MW · built
- Bear Swamp Pumping Load IncreaseBattery storage · 333 MW · built
- Altresco Increase (winter)Gas · 193 MW · built
- Hoosac Wind ProjectOnshore wind · 28.5 MW · built
- Berkshire Wind Power ProjectOnshore wind · 15.0 MW · built
- Syncarpha Blandford Solar plus battery storageSolar + storage · 5.0 MW · built
- Bear Swamp Upper Yard substation - NG Western MA Area Cluster StudySolar · 2.5 MW · built
- Glendale Hydroelectric Expansion ProjectHydro · 0.2 MW · built
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem