BATTERY STORAGE · ISO-NE

Battery Storage

Battery Storage is a 150 MW battery storage request withdrawn in the ISO-NE interconnection queue, in Essex County, Massachusetts.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Mar 2019 (completed)
  2. Withdrawn / abandonedMar 2020 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
847
Grid region
ISO-NE (New England)
Connection point (POI)
Primary POI: Expand NGRID S.Danvers 115 kV substation by connecting to B-154N line Alternative POI: Tap B-154N line two spans west of the S. Danvers substation to construct a new three-breaker ring bu
Location
Essex County, Massachusetts
Technology
Battery: 150 MW
Total requested
150 MW
Service type
Network resource (NRIS)
Study phase
Feasibility Study
Queue status
Withdrawn
Entered queue
19 March 2019
Proposed online date
May 2023
Withdrawn
March 2020

Location

Marker shows the centre of Essex County; the queue data does not give exact sites.

Power plants in Massachusetts · Transmission lines in Massachusetts

Other requests in Essex County