United States β€Ί Grid β€Ί Interconnection queues β€Ί Massachusetts

GAS Β· ISO-NE

Simple Cycle

Simple Cycle is a 478 MW gas request withdrawn in the ISO-NE interconnection queue, in Essex County, Massachusetts.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Feb 2014 (completed)
  2. Withdrawn / abandonedFeb 2015 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
439
Grid region
ISO-NE (New England)
Connection point (POI)
GRID Ward Hill β€šΓ„Γ¬ Tewksbury 345 kV line, approximately 1.8 miles from the Ward Hill
Location
Essex County, Massachusetts
Technology
Gas: 478 MW
Total requested
478 MW
Service type
Network resource (NRIS)
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
24 February 2014
Proposed online date
May 2018
Withdrawn
February 2015

Location

Marker shows the centre of Essex County; the queue data does not give exact sites.

Power plants in Massachusetts Β· Transmission lines in Massachusetts

Other requests in Essex County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem