🔌 EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more → Skip to main content

United States › Grid › Interconnection queues › Massachusetts

BATTERY STORAGE · ISO-NE

Battery Storage

Battery Storage is a 241 MW battery storage request withdrawn in the ISO-NE interconnection queue, in Essex County, Massachusetts.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Mar 2023 (completed)
  2. Withdrawn / abandonedApr 2023 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
1368
Grid region
ISO-NE (New England)
Connection point (POI)
National Grid 115KV Line Q169 - Approximately 0.5 Miles from Lynn Substation
Location
Essex County, Massachusetts
Technology
Battery: 241 MW
Total requested
241 MW
Service type
Network resource (NRIS)
Queue status
Withdrawn
Entered queue
9 March 2023
Proposed online date
April 2027
Withdrawn
April 2023

Location

Marker shows the centre of Essex County; the queue data does not give exact sites.

Power plants in Massachusetts · Transmission lines in Massachusetts

Other requests in Essex County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem