GAS · ISO-NEGas Turbine Increase
Gas Turbine Increase is a 10.9 MW gas request built and operating in the ISO-NE interconnection queue, in Essex County, Massachusetts.
Request details
- Queue ID
- 411
- Grid region
- ISO-NE (New England)
- Connection point (POI)
- Peabody B-154S line
- Location
- Essex County, Massachusetts
- Technology
- Gas: 10.9 MW · Oil
- Total requested
- 10.9 MW
- Study phase
- IA Executed
- Queue status
- Operational
- Entered queue
- 28 February 2013
- Proposed online date
- December 2013
Location
Marker shows the centre of Essex County; the queue data does not give exact sites.
Power plants in Massachusetts · Transmission lines in Massachusetts
Other requests in Essex County
- Battery StorageBattery storage · 225 MW · in study
- Battery StorageBattery storage · 200 MW · in study
- Footprint Combined Cycle UnitGas · 716 MW · built
- Simple Cycle Gas TurbineGas · 61.9 MW · built
- Salem Harbor Station IncreaseOther · 8.0 MW · built
- Covanta Haverhill Landfill GasOther · 1.6 MW · built
- Simple CycleGas · 478 MW · withdrawn
- Battery StorageBattery storage · 315 MW · withdrawn
- Battery StorageBattery storage · 241 MW · withdrawn
- Battery StorageBattery storage · 150 MW · withdrawn
- Peabody PowerGas · 97.2 MW · withdrawn
- NG NEMA Group DER StudyBattery storage · 10.0 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem