πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Grid β€Ί Interconnection queues β€Ί Massachusetts

GAS Β· ISO-NE

Peabody Power

Peabody Power is a 97.2 MW gas request withdrawn in the ISO-NE interconnection queue, in Essex County, Massachusetts, connecting to NGRID.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Feb 2003 (completed)
  2. Withdrawn / abandonedOct 2008 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
102
Grid region
ISO-NE (New England)
Utility / transmission owner
NGRID
Connection point (POI)
C155 & B154 - 115 kV Lines
Location
Essex County, Massachusetts
Technology
Gas: 97.2 MW Β· Oil
Total requested
97.2 MW
Service type
Other
Queue status
Withdrawn
Entered queue
4 February 2003
Proposed online date
May 2008
Withdrawn
October 2008

Location

Marker shows the centre of Essex County; the queue data does not give exact sites.

Power plants in Massachusetts Β· Transmission lines in Massachusetts

Other requests in Essex County