United States › Grid › Interconnection queues › Massachusetts
OTHER · ISO-NESalem Harbor Station Increase
Salem Harbor Station Increase is a 8.0 MW other request built and operating in the ISO-NE interconnection queue, in Essex County, Massachusetts.
Request details
- Queue ID
- 352
- Grid region
- ISO-NE (New England)
- Connection point (POI)
- Salem Switchyard
- Location
- Essex County, Massachusetts
- Technology
- Oil: 8.0 MW · Coal
- Total requested
- 8.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- IA Executed
- Queue status
- Operational
- Entered queue
- 14 December 2010
Location
Marker shows the centre of Essex County; the queue data does not give exact sites.
Power plants in Massachusetts · Transmission lines in Massachusetts
Other requests in Essex County
- Battery StorageBattery storage · 225 MW · in study
- Battery StorageBattery storage · 200 MW · in study
- Footprint Combined Cycle UnitGas · 716 MW · built
- Simple Cycle Gas TurbineGas · 61.9 MW · built
- Gas Turbine IncreaseGas · 10.9 MW · built
- Covanta Haverhill Landfill GasOther · 1.6 MW · built
- Simple CycleGas · 478 MW · withdrawn
- Battery StorageBattery storage · 315 MW · withdrawn
- Battery StorageBattery storage · 241 MW · withdrawn
- Battery StorageBattery storage · 150 MW · withdrawn
- Peabody PowerGas · 97.2 MW · withdrawn
- NG NEMA Group DER StudyBattery storage · 10.0 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem