United States › Grid › Interconnection queues › Massachusetts

BATTERY STORAGE · ISO-NE

Battery Storage Increase (QP1362)

Battery Storage Increase (QP1362) is a 141 MW battery storage request withdrawn in the ISO-NE interconnection queue, in Norfolk County, Massachusetts.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Mar 2023 (completed)
  2. Withdrawn / abandonedOct 2025 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
1373
Grid region
ISO-NE (New England)
Connection point (POI)
Eversource's West Medway 345kV station
Location
Norfolk County, Massachusetts
Technology
Battery: 141 MW
Total requested
141 MW
Service type
Network resource (NRIS)
Queue status
Withdrawn
Entered queue
15 March 2023
Proposed online date
November 2027
Withdrawn
October 2025

Location

Marker shows the centre of Norfolk County; the queue data does not give exact sites.

Power plants in Massachusetts · Transmission lines in Massachusetts

Other requests in Norfolk County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem