United States › Grid › Interconnection queues › Massachusetts
BATTERY STORAGE · ISO-NEBattery Storage
Battery Storage is a 143 MW battery storage request withdrawn in the ISO-NE interconnection queue, in Barnstable County, Massachusetts.
Queue statusWithdrawn / abandoned
- PlanningQueued Mar 2018 (completed)
- Withdrawn / abandonedMar 2019 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 723
- Grid region
- ISO-NE (New England)
- Connection point (POI)
- Primary POI: Eversource 115 kV W. Barnstable Alternative POI 1: Eversource 115 kV Barnstable Alternative POI 2: New Eversource W. Barnstable – Bourne 115 kV line (RSP #1725) tapped at 51% (7.2 miles
- Location
- Barnstable County, Massachusetts
- Technology
- Battery: 143 MW
- Total requested
- 143 MW
- Service type
- Network resource (NRIS)
- Study phase
- System Impact Study
- Queue status
- Withdrawn
- Entered queue
- 1 March 2018
- Proposed online date
- May 2021
- Withdrawn
- March 2019
Location
Marker shows the centre of Barnstable County; the queue data does not give exact sites.
Power plants in Massachusetts · Transmission lines in Massachusetts
Other requests in Barnstable County
- Battery StorageBattery storage · 500 MW · in study
- Canal 3Gas · 333 MW · built
- ENA Old Falmouth Road PV + StorageSolar + storage · 4.8 MW · built
- Battery StorageBattery storage · 200 MW · withdrawn
- Energy StorageBattery storage · 150 MW · withdrawn
- Group @ Hatchville 936 - EMA ASOSolar + storage · 18.5 MW · withdrawn
- WindOnshore wind · 14.9 MW · withdrawn
- Eversource Group @ Sandwich 916Solar + storage · 11.8 MW · withdrawn
- Group @ Orleans 975 - EMA ASOSolar + storage · 10.0 MW · withdrawn
- Eversource Group @ Valley 715Solar + storage · 10.0 MW · withdrawn
- Eversource Group @ Falmouth 993Solar + storage · 8.0 MW · withdrawn
- Hyannis 961 - EMA ASOSolar + storage · 5.0 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem