United States › Grid › Interconnection queues › Massachusetts
GAS · ISO-NECanal 3
Canal 3 is a 333 MW gas request built and operating in the ISO-NE interconnection queue, in Barnstable County, Massachusetts.
Request details
- Queue ID
- 449
- Grid region
- ISO-NE (New England)
- Connection point (POI)
- NU/NStar 345kV Canal Substation
- Location
- Barnstable County, Massachusetts
- Technology
- Gas: 333 MW · Oil
- Total requested
- 333 MW
- Service type
- Network resource (NRIS)
- Study phase
- Executed
- Queue status
- Operational
- Entered queue
- 4 March 2014
- Proposed online date
- June 2019
Location
Marker shows the centre of Barnstable County; the queue data does not give exact sites.
Power plants in Massachusetts · Transmission lines in Massachusetts
Other requests in Barnstable County
- Battery StorageBattery storage · 500 MW · in study
- ENA Old Falmouth Road PV + StorageSolar + storage · 4.8 MW · built
- Battery StorageBattery storage · 200 MW · withdrawn
- Energy StorageBattery storage · 150 MW · withdrawn
- Battery StorageBattery storage · 143 MW · withdrawn
- Group @ Hatchville 936 - EMA ASOSolar + storage · 18.5 MW · withdrawn
- WindOnshore wind · 14.9 MW · withdrawn
- Eversource Group @ Sandwich 916Solar + storage · 11.8 MW · withdrawn
- Group @ Orleans 975 - EMA ASOSolar + storage · 10.0 MW · withdrawn
- Eversource Group @ Valley 715Solar + storage · 10.0 MW · withdrawn
- Eversource Group @ Falmouth 993Solar + storage · 8.0 MW · withdrawn
- Hyannis 961 - EMA ASOSolar + storage · 5.0 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem