United States βΊ Grid βΊ Interconnection queues βΊ Massachusetts
ONSHORE WIND Β· ISO-NEWind
Wind is a 14.9 MW onshore wind request withdrawn in the ISO-NE interconnection queue, in Barnstable County, Massachusetts.
Queue statusWithdrawn / abandoned
- PlanningQueued Dec 2010 (completed)
- Withdrawn / abandonedJun 2011 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 353
- Grid region
- ISO-NE (New England)
- Connection point (POI)
- NSTAR 115 kV Valley substation
- Location
- Barnstable County, Massachusetts
- Technology
- Wind: 14.9 MW
- Total requested
- 14.9 MW
- Service type
- Network resource (NRIS)
- Queue status
- Withdrawn
- Entered queue
- 21 December 2010
- Proposed online date
- November 2012
- Withdrawn
- June 2011
Location
Marker shows the centre of Barnstable County; the queue data does not give exact sites.
Power plants in Massachusetts Β· Transmission lines in Massachusetts
Other requests in Barnstable County
- Battery StorageBattery storage Β· 500 MW Β· in study
- Canal 3Gas Β· 333 MW Β· built
- ENA Old Falmouth Road PV + StorageSolar + storage Β· 4.8 MW Β· built
- Battery StorageBattery storage Β· 200 MW Β· withdrawn
- Energy StorageBattery storage Β· 150 MW Β· withdrawn
- Battery StorageBattery storage Β· 143 MW Β· withdrawn
- Group @ Hatchville 936 - EMA ASOSolar + storage Β· 18.5 MW Β· withdrawn
- Eversource Group @ Sandwich 916Solar + storage Β· 11.8 MW Β· withdrawn
- Group @ Orleans 975 - EMA ASOSolar + storage Β· 10.0 MW Β· withdrawn
- Eversource Group @ Valley 715Solar + storage Β· 10.0 MW Β· withdrawn
- Eversource Group @ Falmouth 993Solar + storage Β· 8.0 MW Β· withdrawn
- Hyannis 961 - EMA ASOSolar + storage Β· 5.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem