United States β€Ί Grid β€Ί Interconnection queues β€Ί Massachusetts

GAS Β· ISO-NE

Gas Turbine

Gas Turbine is a 104 MW gas request withdrawn in the ISO-NE interconnection queue, in Norfolk County, Massachusetts.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Mar 2014 (completed)
  2. Withdrawn / abandonedMar 2015 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
445
Grid region
ISO-NE (New England)
Connection point (POI)
Edgar 115 kV Station
Location
Norfolk County, Massachusetts
Technology
Gas: 104 MW Β· Oil
Total requested
104 MW
Service type
Network resource (NRIS)
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
4 March 2014
Proposed online date
May 2018
Withdrawn
March 2015

Location

Marker shows the centre of Norfolk County; the queue data does not give exact sites.

Power plants in Massachusetts Β· Transmission lines in Massachusetts

Other requests in Norfolk County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem