United States › Grid › Interconnection queues › Massachusetts
BATTERY STORAGE · ISO-NEBattery Storage
Battery Storage is a 130 MW battery storage request withdrawn in the ISO-NE interconnection queue, in Berkshire County, Massachusetts.
Queue statusWithdrawn / abandoned
- PlanningQueued Nov 2022 (completed)
- Withdrawn / abandonedNov 2023 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 1337
- Grid region
- ISO-NE (New England)
- Connection point (POI)
- 7,500' to Adams - NG Q117 VEL - 65,000' Bennington 115 kV line (42.72482385, -73.09931100). (The project site is on the western side of the transmission line off a gravel bank road and on the opposi
- Location
- Berkshire County, Massachusetts
- Technology
- Battery: 130 MW
- Total requested
- 130 MW
- Service type
- Network resource (NRIS)
- Study phase
- System Impact Study
- Queue status
- Withdrawn
- Entered queue
- 22 November 2022
- Proposed online date
- December 2026
- Withdrawn
- November 2023
Location
Marker shows the centre of Berkshire County; the queue data does not give exact sites.
Power plants in Massachusetts · Transmission lines in Massachusetts
Other requests in Berkshire County
- Bear Swamp Unit 1 and 2 UpgradeBattery storage · 66.0 MW · agreement signed
- Berkshire Wind IncreaseOnshore wind · 4.6 MW · agreement signed
- Battery StorageBattery storage · 290 MW · in study
- Battery StorageBattery storage · 170 MW · in study
- Battery StorageBattery storage · 136 MW · in study
- Bear Swamp Pump Load increaseBattery storage · 333 MW · built
- Bear Swamp Pumping Load IncreaseBattery storage · 333 MW · built
- Altresco Increase (winter)Gas · 193 MW · built
- Hoosac Wind ProjectOnshore wind · 28.5 MW · built
- Berkshire Wind Power ProjectOnshore wind · 15.0 MW · built
- Syncarpha Blandford Solar plus battery storageSolar + storage · 5.0 MW · built
- Bear Swamp Upper Yard substation - NG Western MA Area Cluster StudySolar · 2.5 MW · built
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem