United States › Grid › Interconnection queues › Texas
OCTARY USA · INTERCONNECTION QUEUESInterconnection queue in Texas — page 20
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Dodd Solar I Solar · Forest Grove Solar LLC |
202 MW | Agreement signed |
| Donegal Solar Solar · HE-Cottonwood Solar LLC |
202 MW | Agreement signed |
| Soda Lake Solar 2 SLF Solar + storage · Crane II Solar Electric, LLC |
202 MW | Agreement signed |
| Avant Prairie BESS Battery storage · Avant Prairie ESS LLC |
202 MW | In study |
| Mitchell Plant Road Storage Battery storage |
202 MW | Paused / redesign |
| Spurland Solar II Solar · Spurland Solar II |
202 MW | In study |
| Texas Cotton Solar Solar · RWE Solar Development, LLC |
202 MW | In study |
| Goldeneye BESS Battery storage · Black Mountain Energy Storage II |
202 MW | Agreement signed |
| Stoneridge Solar Solar · Stoneridge Solar, LLC |
202 MW | Agreement signed |
| Mesteno Wind Onshore wind · Mesteno Windpower, LLC |
202 MW | Agreement signed |
| OCI Cobb Creek ESS Solar + storage · Hillsboro Solar Project LLC |
202 MW | Agreement signed |
| Cattleman Wind A Onshore wind · RWE Renewables Development, LLC |
202 MW | Paused / redesign |
| Cattleman Wind B Onshore wind · RWE Renewables Development, LLC |
202 MW | Paused / redesign |
| Mitchell Plant Road Solar Solar |
202 MW | Paused / redesign |
| Thomas Cameron BESS Battery storage · Thomas Cameron BESS LLC |
202 MW | Agreement signed |
| Sun Angel ESS Battery storage · Sun Angel ESS LLC |
202 MW | In study |
| Corvus Solar Solar · Corvus Solar, LLC |
202 MW | Agreement signed |
| Soluce Cotton Storage Solar + storage · CTPB1,LLC |
202 MW | In study |
| Tri-X Solar 1 SLF Solar + storage · Crane I Solar Electric, LLC |
202 MW | Agreement signed |
| Tex-Bar ESS Battery storage · Tex-Bar ESS LLC |
202 MW | In study |
| Padua Grid BESS Unit 3 Battery storage · Padua Grid 3, LLC |
201 MW | Agreement signed |
| Exodus BESS Battery storage · Exodus Solar LLC |
201 MW | In study |
| Sawtooth Solar Solar · Sawtooth Solar, LLC |
201 MW | In study |
| Padrino Solar Solar · Hill Solar II, LLC |
201 MW | Agreement signed |
| Nockenut Springs Solar 3 Solar · Pecan Springs Energy, LLC |
201 MW | In study |
| Desert Palm BESS Battery storage · Desert Palm BESS LLC |
201 MW | In study |
| El Molino Solar SLF Solar + storage · El Molino Solar, LLC |
201 MW | In study |
| Caladium BESS Battery storage · Caladium Storage, LLC |
201 MW | In study |
| Snap Jaw BESS Other · Moccasin Pointe Grid, LLC |
201 MW | Paused / redesign |
| Finch Storage Battery storage · Finch Storage, LLC |
201 MW | In study |
| Tucana BESS Battery storage · BRP Tucana BESS LLC |
201 MW | In study |
| Rush ESS Battery storage · OCI Solar Power LLC |
201 MW | In study |
| Eldora BESS Solar + storage · Eldora Energy LLC |
201 MW | Agreement signed |
| Nockenut Springs Solar 5 Solar · Pecan Springs Energy, LLC |
201 MW | In study |
| Nockenut Springs Solar 4 Solar · Pecan Springs Energy, LLC |
201 MW | In study |
| Echols Grove, LLC Solar · Echols Grove, LLC |
201 MW | Agreement signed |
| Savannah Oaks Solar Solar · Savannah Oaks Solar Project LLC |
201 MW | In study |
| Wintergarden BESS Battery storage · Wintergarden BESS LLC |
201 MW | In study |
| Spinosa BESS Battery storage · Spinosa Energy Center, LLC |
201 MW | In study |
| Outer Loop BESS Battery storage · Black Mountain Energy Storage II |
201 MW | In study |
| Apache Hill BESS Battery storage · APACHE HILL ENERGY CENTER |
201 MW | Agreement signed |
| Seragio BESS Battery storage · Seragio BESS, LLC |
201 MW | In study |
| BRP Pictor BESS Battery storage · BRP Pictor BESS LLC |
201 MW | In study |
| Morrow Lake Storage Solar + storage · Morrow Lake Storage, LLC |
201 MW | In study |
| Pine Forest BESS 2 Battery storage |
201 MW | Paused / redesign |
| Dry Creek Solar I Solar · OAK HILL SOLAR LLC |
201 MW | Agreement signed |
| Motif BESS II Battery storage · Motif Storage, LLC |
201 MW | In study |
| Jasper BESS Battery storage · Jasper BESS, LLC |
201 MW | In study |
| Ramsey Storage Battery storage · Hecate Energy Ramsey Storage LLC |
201 MW | Agreement signed |
| Blue Heron BESS Battery storage · Blue Heron BESS, LLC |
201 MW | In study |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- ERCOT (Texas)1,976 · 447.2 GW
- SPP (Southwest Power Pool)79 · 20.6 GW
- MISO (Midcontinent)27 · 6,659 MW
- West (non-ISO utilities)12 · 1,947 MW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)