United States › Grid › Interconnection queues
OCTARY USA · INTERCONNECTION QUEUESInterconnection queue in the USA (2024 requests) — page 19
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Gas project CLPT G31, Laramie County Gas · Cheyenne Light, Fuel & Power |
115 MW | In study |
| Battery storage project 956294, Rockingham County Battery storage |
115 MW | In study |
| Neptune Gas Generation Plant Gas · BPX Production Company |
114 MW | In study |
| Solar project J3687, Fayette County Solar |
113 MW | In study |
| Alpujarra Solar Solar · Greening USA Corp. |
113 MW | In study |
| Solar project J3552, Mcleod County Solar |
112 MW | In study |
| Hydro project 957349, Oconee County Hydro |
112 MW | In study |
| Scrap Iron Solar Solar · Energiekontor US Texas SP 15 LLC |
111 MW | In study |
| Solar + storage project GI-2024-15, Alamosa County Solar + storage |
110 MW | In study |
| Onshore wind project J3602, Mclean County Onshore wind |
110 MW | In study |
| Solar project J3858, Livingston County Solar |
110 MW | In study |
| Solar project 662, Madison County Solar |
110 MW | In study |
| Georgia-Lynn BESS Battery storage · Georgia Lynn BESS LLC |
109 MW | In study |
| Comanche Creek generating station Gas · Longfellow Power LLC |
107 MW | In study |
| Wittig Solar Solar · Greenalia Solar Power Wittig LLC |
107 MW | In study |
| Photon Solar 4 SLF Solar · GulfStar Power, LLC |
106 MW | In study |
| Carolina Storage Friendswood Battery storage · CSE Storage, LLC |
105 MW | In study |
| Solar project J3857, Iosco County Solar |
105 MW | In study |
| Flying Kite Bess Solar + storage · Flying Kite BESS, LLC |
105 MW | In study |
| Starlight Storage Solar + storage · Mills Tx Solar LLC |
105 MW | In study |
| Carolina Storage Young County Battery storage · CSE Storage, LLC |
105 MW | In study |
| Hardeman BESS Battery storage · Quanah BESS LLC |
104 MW | In study |
| Mineral Springs BESS Battery storage · Burnet County LLC |
104 MW | In study |
| Fudge Ranch BESS Battery storage · Crandall BESS LLC |
104 MW | In study |
| Aggie Solar Project SLF Solar + storage · reNRG TX 8 LLC |
104 MW | In study |
| Anawa La BESS Solar + storage · Anawa La Solar LLC |
104 MW | In study |
| Diamond Cowboy Storage Battery storage · Diamond B Storage, LLC |
104 MW | In study |
| Post Trail Energy Battery storage · Post Trail Energy, LLC |
104 MW | In study |
| Gatsby Energy Storage Battery storage · Gatsby Energy Storage LLC |
103 MW | In study |
| Shallow Valley Storage Battery storage · Shallow Valley Storage, LLC |
103 MW | In study |
| Atticus Energy Storage Battery storage · Atticus Energy Storage |
103 MW | In study |
| Massey Storage Battery storage · Massey Storage, LLC |
103 MW | In study |
| Gas project GEN-2024-003, Franklin County Gas |
102 MW | In study |
| Edgewood BESS 1 Battery storage · Tempus Power management LLC |
102 MW | In study |
| Roxton Storage Solar + storage · Roxton Solar, LLC |
102 MW | In study |
| Kurtz Solar SLF Solar + storage · Kurtz Solar, LLC |
102 MW | In study |
| Pamela Heights I Battery storage · Pamela heights I Energy Center LLC |
102 MW | Agreement signed |
| Lucky 7 Solar Solar · Lucky 7 Solar Farm LLC |
102 MW | Agreement signed |
| Maddox Solar Solar · Industrial Lima Project LLC |
101 MW | In study |
| Megamouth Energy Storage Battery storage · GCI Megamouth, LLC |
101 MW | Agreement signed |
| Sandford Storage Solar + storage · BT Sandford Solar, LLC |
101 MW | In study |
| Hondo Arroyo Storage Solar + storage · Hondo Creek Solar, LLC |
101 MW | In study |
| Brahman Renewables Solar Solar + storage · Brahman Renewables |
101 MW | In study |
| Musgravite Solar Solar · BT Thompson Solar, LLC |
101 MW | In study |
| Sugarloaf BESS Battery storage · Sugarloaf Clean Energy LLC |
101 MW | In study |
| Cobra Clean Energy Center Battery storage · Cobra Clean Energy Center LLC |
100 MW | In study |
| Jim Wells BESS Battery storage · Jim Wells ESS |
100 MW | In study |
| Surplus; J199/J202 Other |
100 MW | In study |
| Solar project IC-1244, Newton County Solar |
100 MW | Paused / redesign |
| Battery storage project IA-PNM-2024-01, Roosevelt County Battery storage |
100 MW | In study |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- ERCOT (Texas)436 · 104.7 GW
- MISO (Midcontinent)290 · 62.9 GW
- West (non-ISO utilities)192 · 45.5 GW
- Southeast (non-ISO utilities)178 · 35.0 GW
- SPP (Southwest Power Pool)81 · 18.0 GW
- NYISO (New York)89 · 15.6 GW
- ISO-NE (New England)15 · 3,285 MW
- PJM (Mid-Atlantic, Midwest)2 · 95.0 MW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)