United States › Grid › Interconnection queues › Alabama

SOLAR · SOUTHEAST

Solar project 662, Madison County

Solar project 662, Madison County is a 110 MW solar request in interconnection study in the Southeast interconnection queue, in Madison County, Alabama, connecting to Tennessee Valley Authority.

Queue statusIn planning
  1. PlanningQueued Oct 2024 (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingTarget Apr 2027 (not yet reached)
  5. Closed (not yet reached)

Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.

Request details

Queue ID
662
Grid region
Southeast (non-ISO utilities)
Utility / transmission owner
Tennessee Valley Authority
Connection point (POI)
161 Bus at Limestone substation
Location
Madison County, Alabama
Technology
Solar: 110 MW
Total requested
110 MW
Study phase
Cluster Study
Queue status
Active
Entered queue
1 October 2024
Proposed online date
April 2027

Location

Marker shows the centre of Madison County; the queue data does not give exact sites.

Power plants in Alabama · Transmission lines in Alabama

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem