United States › Grid › Interconnection queues › Alabama
SOLAR · SOUTHEASTSolar project 662, Madison County
Solar project 662, Madison County is a 110 MW solar request in interconnection study in the Southeast interconnection queue, in Madison County, Alabama, connecting to Tennessee Valley Authority.
Queue statusIn planning
- PlanningQueued Oct 2024 (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Apr 2027 (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- 662
- Grid region
- Southeast (non-ISO utilities)
- Utility / transmission owner
- Tennessee Valley Authority
- Connection point (POI)
- 161 Bus at Limestone substation
- Location
- Madison County, Alabama
- Technology
- Solar: 110 MW
- Total requested
- 110 MW
- Study phase
- Cluster Study
- Queue status
- Active
- Entered queue
- 1 October 2024
- Proposed online date
- April 2027
Location
Marker shows the centre of Madison County; the queue data does not give exact sites.
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem