United States › Grid › Interconnection queues › South Carolina
HYDRO · SOUTHEASTHydro project 957349, Oconee County
Hydro project 957349, Oconee County is a 112 MW hydro request in interconnection study in the Southeast interconnection queue, in Oconee County, South Carolina, connecting to Duke Energy Carolinas.
- PlanningQueued Jun 2024 (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- Operating (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- 957349
- Grid region
- Southeast (non-ISO utilities)
- Utility / transmission owner
- Duke Energy Carolinas
- Connection point (POI)
- JOCASSEE HYDRO Substation 230 kV
- Location
- Oconee County, South Carolina
- Technology
- Hydro: 112 MW
- Total requested
- 112 MW
- Service type
- Network resource (NRIS)
- Study phase
- Phase 3 Cluster Study - Study Complete
- Queue status
- Active
- Entered queue
- 27 June 2024
Location
Marker shows the centre of Oconee County; the queue data does not give exact sites.
Power plants in South Carolina · Transmission lines in South Carolina
Other requests in Oconee County
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem