United States › Grid › Interconnection queues
OCTARY USA · INTERCONNECTION QUEUESWithdrawn queue requests in ERCOT (Texas) — page 17
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Kaiser Creek Windfarm Onshore wind · Chermac Energy Corporation |
101 MW | Withdrawn / abandoned |
| Winslow Storage Battery storage · Winslow Storage, LLC |
101 MW | Withdrawn / abandoned |
| Larimar Storage Battery storage · BT S7 Solar, LLC |
101 MW | Withdrawn / abandoned |
| Goldeneye II BESS Other · BLACK MOUNTAIN ENERGY STORAGE II |
101 MW | Withdrawn / abandoned |
| PRO Energy Storage (PES) Other · WattBridge Energy, LLC |
101 MW | Withdrawn / abandoned |
| Mark One Energy Storage 2 Other · Mark One Energy Storage, LLC |
101 MW | Withdrawn / abandoned |
| Topaz 2 Energy Storage Other · Topaz Energy Storage, LLC |
101 MW | Withdrawn / abandoned |
| Vorsavio Grid BESS Other · Vorsavio Grid, LLC |
101 MW | Withdrawn / abandoned |
| Texas Sage Solar SLF Solar · Texas Sage Solar Project, LLC |
101 MW | Withdrawn / abandoned |
| Beachwood Energy Storage (Mark One BESS) Other · Mark One Energy Storage, LLC |
101 MW | Withdrawn / abandoned |
| Spaniel Farm Solar Project Solar · Energiekontor US Texas SP 18 LLC |
101 MW | Withdrawn / abandoned |
| Kobernat Solar Solar · BT Kobernat Solar, LLC |
101 MW | Withdrawn / abandoned |
| Cantaloupe Storage 2 Other · Saragosa Del Sol Energy LLC |
101 MW | Withdrawn / abandoned |
| Project Lynx - Expansion Other · GIGA TEXAS ENERGY LLC |
100 MW | Withdrawn / abandoned |
| West Ranch Solar Solar · Pristine Sun |
100 MW | Withdrawn / abandoned |
| White Camp Solar Solar · White Camp Energy, LLC |
100 MW | Withdrawn / abandoned |
| Vaquillas Wind (TX-31) Onshore wind · Gamesa Energia SW |
100 MW | Withdrawn / abandoned |
| Myrtle Solar II Solar · Myrtle Solar II, LLC |
100 MW | Withdrawn / abandoned |
| BNB Lamesa Solar 2 Solar · BNB |
100 MW | Withdrawn / abandoned |
| Proteus Oak Forest Solar Solar · Oak Forest Solar and Storage, LLC (a Delaware LLC) |
100 MW | Withdrawn / abandoned |
| Braford Wind Onshore wind · Nextera |
100 MW | Withdrawn / abandoned |
| Sandy Hills Solar Solar · SunPower |
100 MW | Withdrawn / abandoned |
| Hess King Solar Solar · Facility Innovations Group |
100 MW | Withdrawn / abandoned |
| RE Maplewood 2e Solar Solar · Recurrent Energy |
100 MW | Withdrawn / abandoned |
| Texas Plains Windpark Onshore wind · Noble Environmental Power |
100 MW | Withdrawn / abandoned |
| North Shore Energy Storage Other · North Shore Energy Storage LLC |
100 MW | Withdrawn / abandoned |
| Cedar Cap Wind Project (USTX-09) Onshore wind · Gamesa Energy USA |
100 MW | Withdrawn / abandoned |
| RE Monument Solar Solar · Recurrent Energy |
100 MW | Withdrawn / abandoned |
| New Falcon Wind Onshore wind · Nextera |
100 MW | Withdrawn / abandoned |
| Jobe Solar Solar · Sun Power |
100 MW | Withdrawn / abandoned |
| Welder Storage Other · Welder Storage, LLC |
100 MW | Withdrawn / abandoned |
| Bluegrove Wind Onshore wind · Innergex |
100 MW | Withdrawn / abandoned |
| Cottonwood Wind Onshore wind · Texas Land Partners |
100 MW | Withdrawn / abandoned |
| Bonham Wind Onshore wind · Nextera |
100 MW | Withdrawn / abandoned |
| Cedar Cap Wind Project 2 Onshore wind · Gamesa Energy USA |
100 MW | Withdrawn / abandoned |
| Locust Solar Solar · SunEdison |
100 MW | Withdrawn / abandoned |
| Dogwood Solar Solar · SunEdison |
100 MW | Withdrawn / abandoned |
| Estacado Solar Solar · Avangrid |
100 MW | Withdrawn / abandoned |
| Sandman Power Storage Battery storage · ALPIN HOLDING LLC |
100 MW | Withdrawn / abandoned |
| Robles Storage Other · Cypress Creek Renewables |
100 MW | Withdrawn / abandoned |
| Briscoe Solar Solar · Juwi Solar |
100 MW | Withdrawn / abandoned |
| Chiltepin Storage Other · Chiltepin Solar-Storage, LLC |
100 MW | Withdrawn / abandoned |
| Angus Wind, LLC Onshore wind · NextEra |
100 MW | Withdrawn / abandoned |
| Owen Solar Solar · Belltown Power |
100 MW | Withdrawn / abandoned |
| Onion Creek Wind Onshore wind · Bobcat Bluff Wind Project LLC |
100 MW | Withdrawn / abandoned |
| Palestine Gas · Castleman Power |
100 MW | Withdrawn / abandoned |
| Hecate Energy Roseland Storage 1 Battery storage · Hecate Energy Roseland Storage 1 LLC |
100 MW | Withdrawn / abandoned |
| Wolverine Other · Energy Storage Resources, LLC |
100 MW | Withdrawn / abandoned |
| Rio Pecos Wind Project - Ph 2 Onshore wind · Akuo Energy USA |
100 MW | Withdrawn / abandoned |
| Welder Storage II Other · Welder Storage, LLC |
100 MW | Withdrawn / abandoned |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- West (non-ISO utilities)5,277 · 949.5 GW
- PJM (Mid-Atlantic, Midwest)5,226 · 638.1 GW
- MISO (Midcontinent)3,261 · 621.9 GW
- CAISO (California)2,186 · 619.9 GW
- Southeast (non-ISO utilities)2,738 · 603.3 GW
- SPP (Southwest Power Pool)1,846 · 382.9 GW
- NYISO (New York)1,531 · 324.1 GW
- ERCOT (Texas)1,158 · 262.0 GW
- ISO-NE (New England)982 · 118.1 GW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)