SOLAR Β· ERCOT

West Ranch Solar

West Ranch Solar is a 100 MW solar request withdrawn in the ERCOT interconnection queue.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jun 2011 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
14INR0014
Grid region
ERCOT (Texas)
Developer
Pristine Sun
Connection point (POI)
8255 Hamilton 138kV
Technology
Solar: 100 MW
Total requested
100 MW
Study phase
FIS
Queue status
Withdrawn
Entered queue
30 June 2011
Proposed online date
December 2018

Location

No county location in the queue data.

Power plants in Β· Transmission lines in

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem