United States βΊ Grid βΊ Interconnection queues βΊ Texas
OTHER Β· ERCOTWelder Storage II
Welder Storage II is a 100 MW other request withdrawn in the ERCOT interconnection queue, in San Patricio County, Texas.
Queue statusWithdrawn / abandoned
- PlanningQueued Apr 2021 (completed)
- Withdrawn / abandonedMar 2024 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 23INR0241
- Grid region
- ERCOT (Texas)
- Developer
- Welder Storage, LLC
- Connection point (POI)
- tap 345kV 8624 Grissom - 8249 Angstrom
- Location
- San Patricio County, Texas
- Technology
- Other: 100 MW
- Total requested
- 100 MW
- Study phase
- FIS
- Queue status
- Withdrawn
- Entered queue
- 8 April 2021
- Proposed online date
- May 2027
- Withdrawn
- March 2024
Location
Marker shows the centre of San Patricio County; the queue data does not give exact sites.
Other requests in San Patricio County
- SanPat Solar ISolar Β· 309 MW Β· agreement signed
- Alila SolarSolar + storage Β· 257 MW Β· agreement signed
- SanPat Solar IISolar Β· 256 MW Β· agreement signed
- Pintail Pass BESSBattery storage Β· 207 MW Β· agreement signed
- Jackalope SolarSolar Β· 156 MW Β· agreement signed
- Bowstring BESSBattery storage Β· 155 MW Β· agreement signed
- Hecate Energy Arkansas WindOnshore wind Β· 1,029 MW Β· in study
- Gregory Power Development SLFGas Β· 470 MW Β· in study
- Titus Low Carbon Ventures Solar 1Solar Β· 338 MW Β· in study
- Sunburst SolarSolar + storage Β· 302 MW Β· in study
- Gulf Gateway Storage OneSolar + storage Β· 301 MW Β· in study
- Gulf Gateway Solar OneSolar + storage Β· 301 MW Β· in study
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem