United States βΊ Grid βΊ Interconnection queues
SOLAR Β· ERCOTWhite Camp Solar
White Camp Solar is a 100 MW solar request withdrawn in the ERCOT interconnection queue.
Queue statusWithdrawn / abandoned
- PlanningQueued Nov 2010 (completed)
- Withdrawn / abandoned (project stopped here)
- ConsentedMay 2013 (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 11INR0094
- Grid region
- ERCOT (Texas)
- Developer
- White Camp Energy, LLC
- Connection point (POI)
- Scurry - Spur (729-6150) 138kV possibly SaltCrk (743)
- Technology
- Solar: 100 MW
- Total requested
- 100 MW
- Study phase
- IA
- Queue status
- Withdrawn
- Entered queue
- 29 November 2010
- Agreement signed
- 1 May 2013
- Proposed online date
- January 2016
Location
No county location in the queue data.
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem