SOLAR Β· ERCOT

White Camp Solar

White Camp Solar is a 100 MW solar request withdrawn in the ERCOT interconnection queue.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Nov 2010 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. ConsentedMay 2013 (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
11INR0094
Grid region
ERCOT (Texas)
Developer
White Camp Energy, LLC
Connection point (POI)
Scurry - Spur (729-6150) 138kV possibly SaltCrk (743)
Technology
Solar: 100 MW
Total requested
100 MW
Study phase
IA
Queue status
Withdrawn
Entered queue
29 November 2010
Agreement signed
1 May 2013
Proposed online date
January 2016

Location

No county location in the queue data.

Power plants in Β· Transmission lines in

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem