United States β€Ί Grid β€Ί Interconnection queues

BATTERY STORAGE Β· ERCOT

Winslow Storage

Winslow Storage is a 101 MW battery storage request withdrawn in the ERCOT interconnection queue.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Feb 2025 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
29INR0086
Grid region
ERCOT (Texas)
Developer
Winslow Storage, LLC
Connection point (POI)
#3522 Hillsboro 138kv Substation
Technology
Battery: 101 MW
Total requested
101 MW
Study phase
FIS
Queue status
Withdrawn
Entered queue
14 February 2025
Proposed online date
January 2029

Location

No county location in the queue data.

Power plants in Β· Transmission lines in

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem