United States βΊ Grid βΊ Interconnection queues
BATTERY STORAGE Β· ERCOTHecate Energy Roseland Storage 1
Hecate Energy Roseland Storage 1 is a 100 MW battery storage request withdrawn in the ERCOT interconnection queue.
Queue statusWithdrawn / abandoned
- Planning (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 22INR0268
- Grid region
- ERCOT (Texas)
- Developer
- Hecate Energy Roseland Storage 1 LLC
- Connection point (POI)
- tap 345kV 3390 Jewett S - 3399 Ratsnake
- Technology
- Battery: 100 MW
- Total requested
- 100 MW
- Study phase
- FIS & SS Incomplete
- Queue status
- Withdrawn
- Proposed online date
- December 2022
Location
No county location in the queue data.
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem