RE Monument Solar

RE Monument Solar is a 100 MW solar request withdrawn in the ERCOT interconnection queue.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Mar 2014 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
16INR0041
Grid region
ERCOT (Texas)
Developer
Recurrent Energy
Connection point (POI)
tap Whitebaker (38430) - Century (38431) 138kV
Technology
Solar: 100 MW
Total requested
100 MW
Study phase
FIS
Queue status
Withdrawn
Entered queue
5 March 2014
Proposed online date
May 2017

Location

No county location in the queue data.

Power plants in Β· Transmission lines in

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem