United States β€Ί Grid β€Ί Interconnection queues β€Ί Texas

OTHER Β· ERCOT

Wolverine

Wolverine is a 100 MW other request withdrawn in the ERCOT interconnection queue, in Burnet County, Texas.

Queue statusWithdrawn / abandoned
  1. PlanningQueued May 2019 (completed)
  2. Withdrawn / abandonedAug 2019 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
20INR0275
Grid region
ERCOT (Texas)
Developer
Energy Storage Resources, LLC
Connection point (POI)
7350 Mormon Mill 138kV
Location
Burnet County, Texas
Technology
Other: 100 MW
Total requested
100 MW
Study phase
FIS
Queue status
Withdrawn
Entered queue
21 May 2019
Proposed online date
March 2021
Withdrawn
August 2019

Location

Marker shows the centre of Burnet County; the queue data does not give exact sites.

Power plants in Texas Β· Transmission lines in Texas

Other requests in Burnet County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem