United States βΊ Grid βΊ Interconnection queues βΊ Texas
OTHER Β· ERCOTWolverine
Wolverine is a 100 MW other request withdrawn in the ERCOT interconnection queue, in Burnet County, Texas.
Queue statusWithdrawn / abandoned
- PlanningQueued May 2019 (completed)
- Withdrawn / abandonedAug 2019 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 20INR0275
- Grid region
- ERCOT (Texas)
- Developer
- Energy Storage Resources, LLC
- Connection point (POI)
- 7350 Mormon Mill 138kV
- Location
- Burnet County, Texas
- Technology
- Other: 100 MW
- Total requested
- 100 MW
- Study phase
- FIS
- Queue status
- Withdrawn
- Entered queue
- 21 May 2019
- Proposed online date
- March 2021
- Withdrawn
- August 2019
Location
Marker shows the centre of Burnet County; the queue data does not give exact sites.
Other requests in Burnet County
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem