Spaniel Farm Solar Project

Spaniel Farm Solar Project is a 101 MW solar request withdrawn in the ERCOT interconnection queue.

Queue statusWithdrawn / abandoned
  1. PlanningQueued May 2023 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
25INR0452
Grid region
ERCOT (Texas)
Developer
Energiekontor US Texas SP 18 LLC
Connection point (POI)
Tap 138 kV 2241 Ennis West Switch - 12320 Templeton
Technology
Solar: 101 MW
Total requested
101 MW
Study phase
FIS
Queue status
Withdrawn
Entered queue
3 May 2023
Proposed online date
April 2027

Location

No county location in the queue data.

Power plants in Β· Transmission lines in