United States βΊ Grid βΊ Interconnection queues
SOLAR Β· ERCOTSpaniel Farm Solar Project
Spaniel Farm Solar Project is a 101 MW solar request withdrawn in the ERCOT interconnection queue.
Queue statusWithdrawn / abandoned
- PlanningQueued May 2023 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 25INR0452
- Grid region
- ERCOT (Texas)
- Developer
- Energiekontor US Texas SP 18 LLC
- Connection point (POI)
- Tap 138 kV 2241 Ennis West Switch - 12320 Templeton
- Technology
- Solar: 101 MW
- Total requested
- 101 MW
- Study phase
- FIS
- Queue status
- Withdrawn
- Entered queue
- 3 May 2023
- Proposed online date
- April 2027
Location
No county location in the queue data.
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem