United States β€Ί Grid β€Ί Interconnection queues β€Ί Texas

OTHER Β· ERCOT

Topaz 2 Energy Storage

Topaz 2 Energy Storage is a 101 MW other request withdrawn in the ERCOT interconnection queue, in Galveston County, Texas.

Queue statusWithdrawn / abandoned
  1. Planning (completed)
  2. Withdrawn / abandonedMar 2021 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
22INR0507
Grid region
ERCOT (Texas)
Developer
Topaz Energy Storage, LLC
Connection point (POI)
38745 TN Attwater 138kV
Location
Galveston County, Texas
Technology
Other: 101 MW
Total requested
101 MW
Study phase
FIS & SS Incomplete
Queue status
Withdrawn
Proposed online date
June 2022
Withdrawn
March 2021

Location

Marker shows the centre of Galveston County; the queue data does not give exact sites.

Power plants in Texas Β· Transmission lines in Texas

Other requests in Galveston County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem