PRO Energy Storage (PES)

PRO Energy Storage (PES) is a 101 MW other request withdrawn in the ERCOT interconnection queue, in Harris County, Texas.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Feb 2021 (completed)
  2. Withdrawn / abandonedSep 2023 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
22INR0450
Grid region
ERCOT (Texas)
Developer
WattBridge Energy, LLC
Connection point (POI)
47150 H.O. Clarke 138kV
Location
Harris County, Texas
Technology
Other: 101 MW
Total requested
101 MW
Study phase
FIS
Queue status
Withdrawn
Entered queue
8 February 2021
Proposed online date
June 2024
Withdrawn
September 2023

Location

Marker shows the centre of Harris County; the queue data does not give exact sites.

Power plants in Texas Β· Transmission lines in Texas

Other requests in Harris County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem