SOLAR Β· ERCOT

Owen Solar

Owen Solar is a 100 MW solar request withdrawn in the ERCOT interconnection queue.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Mar 2018 (completed)
  2. Withdrawn / abandonedAug 2018 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
20INR0060
Grid region
ERCOT (Texas)
Developer
Belltown Power
Connection point (POI)
tap 138kV 177 Bosque - 181 Cayote
Technology
Solar: 100 MW
Total requested
100 MW
Study phase
FIS
Queue status
Withdrawn
Entered queue
2 March 2018
Proposed online date
April 2020
Withdrawn
August 2018

Location

No county location in the queue data.

Power plants in Β· Transmission lines in

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem