United States β€Ί Grid β€Ί Interconnection queues

SOLAR Β· ERCOT

Jobe Solar

Jobe Solar is a 100 MW solar request withdrawn in the ERCOT interconnection queue.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Dec 2014 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
16INR0075
Grid region
ERCOT (Texas)
Developer
Sun Power
Connection point (POI)
Culberson 138kV (1097)
Technology
Solar: 100 MW
Total requested
100 MW
Study phase
FIS
Queue status
Withdrawn
Entered queue
22 December 2014
Proposed online date
December 2017

Location

No county location in the queue data.

Power plants in Β· Transmission lines in

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem