SOLAR Β· ERCOT

RE Maplewood 2e Solar

RE Maplewood 2e Solar is a 100 MW solar request withdrawn in the ERCOT interconnection queue, in Pecos County, Texas.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Oct 2014 (completed)
  2. Withdrawn / abandonedMar 2019 (project stopped here)
  3. ConsentedFeb 2016 (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
17INR0020e
Grid region
ERCOT (Texas)
Developer
Recurrent Energy
Connection point (POI)
76002 Bakersfield 345kV
Location
Pecos County, Texas
Technology
Solar: 100 MW
Total requested
100 MW
Study phase
IA and FIS Pending
Queue status
Withdrawn
Entered queue
16 October 2014
Agreement signed
3 February 2016
Proposed online date
December 2020
Withdrawn
March 2019

Location

Marker shows the centre of Pecos County; the queue data does not give exact sites.

Power plants in Texas Β· Transmission lines in Texas

Other requests in Pecos County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem