United States βΊ Grid βΊ Interconnection queues βΊ Texas
SOLAR Β· ERCOTRE Maplewood 2e Solar
RE Maplewood 2e Solar is a 100 MW solar request withdrawn in the ERCOT interconnection queue, in Pecos County, Texas.
Queue statusWithdrawn / abandoned
- PlanningQueued Oct 2014 (completed)
- Withdrawn / abandonedMar 2019 (project stopped here)
- ConsentedFeb 2016 (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 17INR0020e
- Grid region
- ERCOT (Texas)
- Developer
- Recurrent Energy
- Connection point (POI)
- 76002 Bakersfield 345kV
- Location
- Pecos County, Texas
- Technology
- Solar: 100 MW
- Total requested
- 100 MW
- Study phase
- IA and FIS Pending
- Queue status
- Withdrawn
- Entered queue
- 16 October 2014
- Agreement signed
- 3 February 2016
- Proposed online date
- December 2020
- Withdrawn
- March 2019
Location
Marker shows the centre of Pecos County; the queue data does not give exact sites.
Other requests in Pecos County
- Laurel Wind Energy CenterOnshore wind Β· 307 MW Β· agreement signed
- Longfellow Solar IISolar + storage Β· 207 MW Β· agreement signed
- Pecos Storage CenterWind + storage Β· 201 MW Β· agreement signed
- Longfellow Solar ISolar + storage Β· 178 MW Β· agreement signed
- Headcamp Energy Storage PlantBattery storage Β· 153 MW Β· agreement signed
- Longfellow BESS IISolar + storage Β· 106 MW Β· agreement signed
- Sherbino II BESS SLFBattery storage Β· 77.4 MW Β· agreement signed
- Longfellow BESS ISolar + storage Β· 55.0 MW Β· agreement signed
- Downtown BESSBattery storage Β· 10.0 MW Β· agreement signed
- Alamo Street BESSBattery storage Β· 10.0 MW Β· agreement signed
- Indian Mesa repowerOnshore wind Β· 9.3 MW Β· agreement signed
- Desert Sky repowerOnshore wind Β· 7.2 MW Β· agreement signed
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem