BATTERY STORAGE Β· ERCOT

Sandman Power Storage

Sandman Power Storage is a 100 MW battery storage request withdrawn in the ERCOT interconnection queue.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Mar 2022 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
25INR0054
Grid region
ERCOT (Texas)
Developer
ALPIN HOLDING LLC
Connection point (POI)
1685 Farmersville Switch 345kV
Technology
Battery: 100 MW
Total requested
100 MW
Study phase
FIS
Queue status
Withdrawn
Entered queue
21 March 2022
Proposed online date
April 2026

Location

No county location in the queue data.

Power plants in Β· Transmission lines in

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem