United States β€Ί Grid β€Ί Interconnection queues β€Ί Texas

SOLAR Β· ERCOT

Estacado Solar

Estacado Solar is a 100 MW solar request withdrawn in the ERCOT interconnection queue, in Deaf Smith County, Texas.

Queue statusWithdrawn / abandoned
  1. PlanningQueued May 2015 (completed)
  2. Withdrawn / abandonedJan 2019 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
17INR0030
Grid region
ERCOT (Texas)
Developer
Avangrid
Connection point (POI)
79502 Windmill 345kV
Location
Deaf Smith County, Texas
Technology
Solar: 100 MW
Total requested
100 MW
Study phase
FIS
Queue status
Withdrawn
Entered queue
11 May 2015
Proposed online date
December 2019
Withdrawn
January 2019

Location

Marker shows the centre of Deaf Smith County; the queue data does not give exact sites.

Power plants in Texas Β· Transmission lines in Texas

Other requests in Deaf Smith County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem