United States βΊ Grid βΊ Interconnection queues βΊ Texas
SOLAR Β· ERCOTEstacado Solar
Estacado Solar is a 100 MW solar request withdrawn in the ERCOT interconnection queue, in Deaf Smith County, Texas.
Queue statusWithdrawn / abandoned
- PlanningQueued May 2015 (completed)
- Withdrawn / abandonedJan 2019 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 17INR0030
- Grid region
- ERCOT (Texas)
- Developer
- Avangrid
- Connection point (POI)
- 79502 Windmill 345kV
- Location
- Deaf Smith County, Texas
- Technology
- Solar: 100 MW
- Total requested
- 100 MW
- Study phase
- FIS
- Queue status
- Withdrawn
- Entered queue
- 11 May 2015
- Proposed online date
- December 2019
- Withdrawn
- January 2019
Location
Marker shows the centre of Deaf Smith County; the queue data does not give exact sites.
Other requests in Deaf Smith County
- Aurelius SolarSolar Β· 1,124 MW Β· agreement signed
- Aurelius WindOnshore wind Β· 622 MW Β· agreement signed
- Renegade ProjectSolar Β· 516 MW Β· agreement signed
- Caliche Mound SolarSolar Β· 407 MW Β· agreement signed
- Aurelius 3 WindOnshore wind Β· 623 MW Β· in study
- Aurelius 2 WindOnshore wind Β· 622 MW Β· in study
- Aurelius 2 SolarSolar Β· 445 MW Β· in study
- Aurelius 3 SolarSolar Β· 445 MW Β· in study
- White Tail SolarSolar Β· 227 MW Β· in study
- BRP Hemera BESSBattery storage Β· 207 MW Β· in study
- Gas project GEN-2014-067, Deaf Smith CountyGas Β· 356 MW Β· withdrawn
- Frio Flat WindOnshore wind Β· 305 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem