Aurelius 3 Solar

Aurelius 3 Solar is a 445 MW solar request in interconnection study in the ERCOT interconnection queue, in Deaf Smith County, Texas.

Queue statusIn planning
  1. PlanningQueued Dec 2023 (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingTarget Mar 2029 (not yet reached)
  5. Closed (not yet reached)

Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.

Request details

Queue ID
29INR0011
Grid region
ERCOT (Texas)
Developer
IP Roman III, LLC
Connection point (POI)
23908 Deaf Smith station 345 kV. This INR has a 600 MW PUN load at the medium voltage side of the MPTs for a total of 1800 MW PUN load (refer to the substation SLD).
Location
Deaf Smith County, Texas
Technology
Solar: 445 MW
Total requested
445 MW
Study phase
SS Completed, FIS Started, No IA
Queue status
Active
Entered queue
4 December 2023
Proposed online date
March 2029

Location

Marker shows the centre of Deaf Smith County; the queue data does not give exact sites.

Power plants in Texas · Transmission lines in Texas

Other requests in Deaf Smith County