United States βΊ Grid βΊ Interconnection queues βΊ Texas
GAS Β· SPPGas project GEN-2014-067, Deaf Smith County
Gas project GEN-2014-067, Deaf Smith County is a 356 MW gas request withdrawn in the SPP interconnection queue, in Deaf Smith County, Texas, connecting to SPS.
Queue statusWithdrawn / abandoned
- PlanningQueued Sep 2014 (completed)
- Withdrawn / abandonedFeb 2015 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- GEN-2014-067
- Grid region
- SPP (Southwest Power Pool)
- Utility / transmission owner
- SPS
- Connection point (POI)
- Tap Potter County - New Hart 230kV
- Location
- Deaf Smith County, Texas
- Technology
- Gas: 356 MW
- Total requested
- 356 MW
- Service type
- Energy only (ERIS)
- Study phase
- WITHDRAWN
- Queue status
- Withdrawn
- Entered queue
- 30 September 2014
- Proposed online date
- March 2019
- Withdrawn
- February 2015
Location
Marker shows the centre of Deaf Smith County; the queue data does not give exact sites.
Other requests in Deaf Smith County
- Aurelius SolarSolar Β· 1,124 MW Β· agreement signed
- Aurelius WindOnshore wind Β· 622 MW Β· agreement signed
- Renegade ProjectSolar Β· 516 MW Β· agreement signed
- Caliche Mound SolarSolar Β· 407 MW Β· agreement signed
- Aurelius 3 WindOnshore wind Β· 623 MW Β· in study
- Aurelius 2 WindOnshore wind Β· 622 MW Β· in study
- Aurelius 2 SolarSolar Β· 445 MW Β· in study
- Aurelius 3 SolarSolar Β· 445 MW Β· in study
- White Tail SolarSolar Β· 227 MW Β· in study
- BRP Hemera BESSBattery storage Β· 207 MW Β· in study
- Frio Flat WindOnshore wind Β· 305 MW Β· withdrawn
- Solar project GEN-2024-363, Deaf Smith CountySolar Β· 300 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem