Goldeneye II BESS

Goldeneye II BESS is a 101 MW other request withdrawn in the ERCOT interconnection queue, in Bell County, Texas.

Queue statusWithdrawn / abandoned
  1. Planning (completed)
  2. Withdrawn / abandonedAug 2022 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
25INR0158
Grid region
ERCOT (Texas)
Developer
BLACK MOUNTAIN ENERGY STORAGE II
Connection point (POI)
3423 KILLEEN SS
Location
Bell County, Texas
Technology
Other: 101 MW
Total requested
101 MW
Study phase
FIS & SS Incomplete
Queue status
Withdrawn
Proposed online date
April 2025
Withdrawn
August 2022

Location

Marker shows the centre of Bell County; the queue data does not give exact sites.

Power plants in Texas Β· Transmission lines in Texas

Other requests in Bell County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem