United States › Grid › Interconnection queues

OCTARY USA · INTERCONNECTION QUEUES

Interconnection queue in the USA (2021 requests) — page 15

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown896227.7 GW
Active in queue227.7 GW896 requests
Agreement signed73.3 GW270 requests
Withdrawn2,149339.1 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

896 requests · page 15 of 18
ProjectCapacityStatusLocationRegionQueuedOnline
Solar + storage project 412, Gallatin County
Solar + storage
80.0 MWPaused / redesign Gallatin, MTWest Jun 2021
Solar + storage project IC-999, Baldwin County
Solar + storage
80.0 MWPaused / redesign Baldwin, ALSoutheast Dec 2021target 2026
Solar + storage project IC-971, Lowndes County
Solar + storage
80.0 MWPaused / redesign Lowndes, ALSoutheast Jul 2021target 2026
Solar + storage project IC-954, Conecuh County
Solar + storage
80.0 MWPaused / redesign Conecuh, ALSoutheast Apr 2021target 2026
Backwater Solar
Solar
80.0 MWPaused / redesign Cooke, TXERCOT Aug 2021target 2024
Solar + storage project IC-997, Baldwin County
Solar + storage
80.0 MWPaused / redesign Baldwin, ALSoutheast Dec 2021target 2026
Solar + storage project IC-1000, Baldwin County
Solar + storage
80.0 MWPaused / redesign Baldwin, ALSoutheast Dec 2021target 2026
Solar + storage project IC-979, Conecuh County
Solar + storage
80.0 MWPaused / redesign Conecuh, ALSoutheast Aug 2021target 2026
Solar project IC-1001, Early County
Solar
80.0 MWPaused / redesign Early, GASoutheast Dec 2021target 2025
Solar project AH2-002, Barren County
Solar
80.0 MWIn study Barren, KYPJM Oct 2021target 2024
Solar project BHBE G15, Meade County
Solar · Vedauwoo Holdings Black Hills 1 LLC
80.0 MWAgreement signed Meade, SDWest May 2021target 2024
Solar project IC-943, Talladega County
Solar
80.0 MWPaused / redesign Talladega, ALSoutheast Mar 2021target 2025
Solar project IC-975, Dale County
Solar
80.0 MWPaused / redesign Dale, ALSoutheast Jul 2021target 2025
Holtsville Brookhaven Battery Storage
Battery storage · Holtsville Brookhaven Battery Storage LLC
79.9 MWIn study Suffolk, NYNYISO Sep 2021target 2026
Valetudo Energy Storage
Battery storage
79.6 MWIn study Madera, CACAISO Apr 2021target 2028
Gaia Storage
Solar + storage · Gaia Solar, LLC
78.8 MWAgreement signed Navarro, TXERCOT Dec 2021target 2026
Solar project IC-1002, Decatur County
Solar
78.0 MWPaused / redesign Decatur, GASoutheast Dec 2021target 2025
Naduah Solar
Solar · Gransolar Texas Fifteen, LLC
77.6 MWIn study Limestone, TXERCOT Sep 2021target 2027
Solar project J2316, Dickinson County
Solar
77.5 MWIn study Dickinson, MIMISO Sep 2021target 2023
Eagle Springs Solar
Solar + storage · Eagle Springs Solar, LLC
77.2 MWAgreement signed Delta, TXERCOT Oct 2021target 2026
Eytcheson Ranches Solar
Solar · Gransolar Texas Fourteen, LLC
76.4 MWIn study Navarro, TXERCOT Sep 2021target 2028
Palmetto Energy Storage
Battery storage
75.6 MWIn study Alameda, CACAISO Apr 2021target 2030
Battery storage project G0717, Klickitat County
Battery storage
75.0 MWIn study Klickitat, WAWest Dec 2021target 2024
Battery storage project GEN-2021-052, Muskogee County
Battery storage
75.0 MWAgreement signed Muskogee, OKSPP Apr 2021target 2031
Solar project 167, Darlington County
Solar
75.0 MWPaused / redesign Darlington, SCSoutheast Oct 2021target 2025
Solar project J2068, Pierce County
Solar
75.0 MWIn study Pierce, WIMISO Jul 2021target 2024
Battery storage project GI-2021-146, Imperial County
Battery storage
75.0 MWIn study Imperial, CAWest Nov 2021target 2025
Solar project J2010, Arkansas County
Solar
75.0 MWIn study Arkansas, ARMISO Aug 2021target 2028
Solar + storage project GI-2021-147, Imperial County
Solar + storage
75.0 MWIn study Imperial, CAWest Nov 2021target 2024
Photo BESS 1
Solar + storage · CED Development Inc.
75.0 MWIn study Uvalde, TXERCOT Oct 2021target 2027
Solar project J1561, Acadia Parish County
Solar
75.0 MWAgreement signed Acadia Parish, LAMISO Oct 2021target 2026
Battery storage project GEN-2021-048, Lancaster County
Battery storage
75.0 MWAgreement signed Lancaster, NESPP Apr 2021target 2029
Solar project 925531, Williamsburg County
Solar
74.9 MWUnder construction Williamsburg, SCSoutheast Jun 2021target 2026
Solar + storage project JEA-Q009, Duval County
Solar + storage
74.9 MWIn study Duval, FLSoutheast Jul 2021target 2026
Battery storage project GEN-2021-019, Noble County
Battery storage
74.9 MWAgreement signed Noble, OKSPP Apr 2021target 2028
Solar + storage project 425, Bradford County
Solar + storage · Third Party
74.9 MWAgreement signed Bradford, FLSoutheast Aug 2021target 2028
Solar project 293, Alachua County
Solar · Pleasant Solar, LLC
74.9 MWPaused / redesign Alachua, FLSoutheast Aug 2021target 2024
Solar project 424D, Madison County
Solar · FPL
74.5 MWIn study Madison, FLSoutheast Aug 2021target 2027
Solar project 424A, Leon County
Solar · FPL
74.5 MWIn study Leon, FLSoutheast Aug 2021target 2033
Solar project 424B, Leon County
Solar · FPL
74.5 MWIn study Leon, FLSoutheast Aug 2021target 2033
Solar project 424, Manatee County
Solar · FPL
74.5 MWIn study Manatee, FLSoutheast May 2021target 2027
Umbra (Stockyard) BESS
Battery storage
73.0 MWPaused / redesign Franklin, TXERCOT Jan 2021
Hoffman Falls Wind
Onshore wind · Hoffman Falls Wind LLC
72.0 MWIn study Madison, NYNYISO Jan 2021target 2027
Tarragon Hybrid
Solar + storage
71.9 MWIn study Fresno, CACAISO Apr 2021target 2028
Hammerhead Storage
Battery storage
71.3 MWIn study San Diego, CACAISO Apr 2021target 2030
Venture Hill Storage
Battery storage · KCE TX 24, LLC
70.4 MWIn study Travis, TXERCOT Feb 2021target 2026
Onshore wind project 401, Musselshell County
Onshore wind
70.0 MWIn study Musselshell, MTWest Jan 2021target 2023
Blue Jay Solar II
Solar · Blue Jay Solar I, LLC
69.0 MWAgreement signed Grimes, TXERCOT Apr 2021target 2025
Solar project J2177, Tipton County
Solar
67.0 MWIn study Tipton, INMISO Aug 2021target 2024
Onshore wind project J1998, Franklin County
Onshore wind
66.0 MWIn study Franklin, IAMISO Aug 2021target 2024
Page 15 of 18

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)