United States › Grid › Interconnection queues › Florida
SOLAR · SOUTHEASTSolar project 293, Alachua County
Solar project 293, Alachua County is a 74.9 MW solar request suspended in the Southeast interconnection queue, in Alachua County, Florida, connecting to Duke Energy Florida.
Queue statusPaused / redesign
- PlanningQueued Aug 2021 (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Sep 2024 (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- 293
- Grid region
- Southeast (non-ISO utilities)
- Utility / transmission owner
- Duke Energy Florida
- Developer
- Pleasant Solar, LLC
- Connection point (POI)
- Highsprings to Hull Road
- Location
- Alachua County, Florida
- Technology
- Solar: 74.9 MW
- Total requested
- 74.9 MW
- Service type
- NRIS and ERIS
- Queue status
- Suspended
- Entered queue
- 6 August 2021
- Proposed online date
- September 2024
Location
Marker shows the centre of Alachua County; the queue data does not give exact sites.
Other requests in Alachua County
- Solar project 284, Alachua CountySolar · 74.5 MW · in study
- Solar project 312, Alachua CountySolar · 74.5 MW · suspended
- Solar project 311, Alachua CountySolar · 74.5 MW · suspended
- Solar project 190A, Alachua CountySolar · 74.9 MW · built
- Solar project 277, Alachua CountySolar · 74.9 MW · built
- Solar project 201, Alachua CountySolar · 75.0 MW · withdrawn
- Solar project 140, Alachua CountySolar · 75.0 MW · withdrawn
- Solar project 189C, Alachua CountySolar · 74.9 MW · withdrawn
- Solar project 147A, Alachua CountySolar · 74.9 MW · withdrawn
- Solar project 276, Alachua CountySolar · 74.9 MW · withdrawn
- Solar project 231, Alachua CountySolar · 74.9 MW · withdrawn
- Solar project 278, Alachua CountySolar · 74.9 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem