United States › Grid › Interconnection queues › Florida
SOLAR · SOUTHEASTSolar project 190A, Alachua County
Solar project 190A, Alachua County is a 74.9 MW solar request built and operating in the Southeast interconnection queue, in Alachua County, Florida, connecting to Duke Energy Florida.
Request details
- Queue ID
- 190A
- Grid region
- Southeast (non-ISO utilities)
- Utility / transmission owner
- Duke Energy Florida
- Developer
- Duke Energy Florida, LLC
- Connection point (POI)
- Ginnie Substation
- Location
- Alachua County, Florida
- Technology
- Solar: 74.9 MW
- Total requested
- 74.9 MW
- Service type
- NRIS and ERIS
- Study phase
- IA Executed
- Queue status
- Operational
- Entered queue
- 27 June 2017
- Proposed online date
- April 2023
- Came online
- April 2023
Location
Marker shows the centre of Alachua County; the queue data does not give exact sites.
Other requests in Alachua County
- Solar project 284, Alachua CountySolar · 74.5 MW · in study
- Solar project 293, Alachua CountySolar · 74.9 MW · suspended
- Solar project 312, Alachua CountySolar · 74.5 MW · suspended
- Solar project 311, Alachua CountySolar · 74.5 MW · suspended
- Solar project 277, Alachua CountySolar · 74.9 MW · built
- Solar project 201, Alachua CountySolar · 75.0 MW · withdrawn
- Solar project 140, Alachua CountySolar · 75.0 MW · withdrawn
- Solar project 189C, Alachua CountySolar · 74.9 MW · withdrawn
- Solar project 147A, Alachua CountySolar · 74.9 MW · withdrawn
- Solar project 276, Alachua CountySolar · 74.9 MW · withdrawn
- Solar project 231, Alachua CountySolar · 74.9 MW · withdrawn
- Solar project 278, Alachua CountySolar · 74.9 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem