SOLAR Β· SOUTHEASTSolar project 189C, Alachua County
Solar project 189C, Alachua County is a 74.9 MW solar request withdrawn in the Southeast interconnection queue, in Alachua County, Florida, connecting to Duke Energy Florida.
Queue statusWithdrawn / abandoned
- PlanningQueued Jun 2017 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 189C
- Grid region
- Southeast (non-ISO utilities)
- Utility / transmission owner
- Duke Energy Florida
- Developer
- Masked
- Connection point (POI)
- High Springs Substation
- Location
- Alachua County, Florida
- Technology
- Solar: 74.9 MW
- Total requested
- 74.9 MW
- Service type
- NRIS and ERIS
- Queue status
- Withdrawn
- Entered queue
- 20 June 2017
- Proposed online date
- December 2020
Location
Marker shows the centre of Alachua County; the queue data does not give exact sites.
Other requests in Alachua County
- Solar project 284, Alachua CountySolar Β· 74.5 MW Β· in study
- Solar project 293, Alachua CountySolar Β· 74.9 MW Β· suspended
- Solar project 312, Alachua CountySolar Β· 74.5 MW Β· suspended
- Solar project 311, Alachua CountySolar Β· 74.5 MW Β· suspended
- Solar project 190A, Alachua CountySolar Β· 74.9 MW Β· built
- Solar project 277, Alachua CountySolar Β· 74.9 MW Β· built
- Solar project 201, Alachua CountySolar Β· 75.0 MW Β· withdrawn
- Solar project 140, Alachua CountySolar Β· 75.0 MW Β· withdrawn
- Solar project 147A, Alachua CountySolar Β· 74.9 MW Β· withdrawn
- Solar project 276, Alachua CountySolar Β· 74.9 MW Β· withdrawn
- Solar project 231, Alachua CountySolar Β· 74.9 MW Β· withdrawn
- Solar project 278, Alachua CountySolar Β· 74.9 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem