United States › Grid › Interconnection queues › Florida
SOLAR · SOUTHEASTSolar project 284, Alachua County
Solar project 284, Alachua County is a 74.5 MW solar request in interconnection study in the Southeast interconnection queue, in Alachua County, Florida, connecting to Duke Energy Florida.
Queue statusIn planning
- PlanningQueued Apr 2020 (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Dec 2022 (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- 284
- Grid region
- Southeast (non-ISO utilities)
- Utility / transmission owner
- Duke Energy Florida
- Developer
- Florida Renewable Partners, LLC
- Connection point (POI)
- Archer Substation
- Location
- Alachua County, Florida
- Technology
- Solar: 74.5 MW
- Total requested
- 74.5 MW
- Service type
- NRIS and ERIS
- Study phase
- System Impact Study
- Queue status
- Active
- Entered queue
- 21 April 2020
- Proposed online date
- December 2022
Location
Marker shows the centre of Alachua County; the queue data does not give exact sites.
Other requests in Alachua County
- Solar project 293, Alachua CountySolar · 74.9 MW · suspended
- Solar project 312, Alachua CountySolar · 74.5 MW · suspended
- Solar project 311, Alachua CountySolar · 74.5 MW · suspended
- Solar project 190A, Alachua CountySolar · 74.9 MW · built
- Solar project 277, Alachua CountySolar · 74.9 MW · built
- Solar project 201, Alachua CountySolar · 75.0 MW · withdrawn
- Solar project 140, Alachua CountySolar · 75.0 MW · withdrawn
- Solar project 189C, Alachua CountySolar · 74.9 MW · withdrawn
- Solar project 147A, Alachua CountySolar · 74.9 MW · withdrawn
- Solar project 276, Alachua CountySolar · 74.9 MW · withdrawn
- Solar project 231, Alachua CountySolar · 74.9 MW · withdrawn
- Solar project 278, Alachua CountySolar · 74.9 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem