United States › Grid › Interconnection queues › Iowa
ONSHORE WIND · MISOOnshore wind project J1998, Franklin County
Onshore wind project J1998, Franklin County is a 66.0 MW onshore wind request in interconnection study in the MISO interconnection queue, in Franklin County, Iowa, connecting to ITC MIDWEST.
Queue statusIn planning
- PlanningQueued Aug 2021 (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Jun 2024 (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- J1998
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- ITC MIDWEST
- Connection point (POI)
- Nuthatch Switching Station
- Location
- Franklin County, Iowa
- Technology
- Wind: 66.0 MW
- Total requested
- 66.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- Study Phase: DPP 3; Post GIA Status: Not Started
- Queue status
- Active
- Entered queue
- 4 August 2021
- Proposed online date
- June 2024
Location
Marker shows the centre of Franklin County; the queue data does not give exact sites.
Other requests in Franklin County
- Onshore wind project E0015, Franklin CountyOnshore wind · 360 MW · in study
- Onshore wind project J1867, Franklin CountyOnshore wind · 200 MW · in study
- Surplus; J416Battery storage · 200 MW · in study
- Gas project J3154, Franklin CountyGas · 160 MW · in study
- Solar project J4037, Franklin CountySolar · 100 MW · in study
- Onshore wind project J2122, Franklin CountyOnshore wind · 33.0 MW · in study
- Onshore wind project J416, Franklin CountyOnshore wind · 200 MW · built
- Onshore wind project G947, Franklin CountyOnshore wind · 99.0 MW · built
- Onshore wind project G574, Franklin CountyOnshore wind · 80.0 MW · built
- Onshore wind project G573, Franklin CountyOnshore wind · 80.0 MW · built
- Onshore wind project G575, Franklin CountyOnshore wind · 40.0 MW · built
- Solar project J1547, Franklin CountySolar · 250 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem