United States › Grid › Interconnection queues › Montana
ONSHORE WIND · WESTOnshore wind project 401, Musselshell County
Onshore wind project 401, Musselshell County is a 70.0 MW onshore wind request in interconnection study in the West interconnection queue, in Musselshell County, Montana, connecting to NorthWestern Energy.
- PlanningQueued Jan 2021 (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Nov 2023 (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- 401
- Grid region
- West (non-ISO utilities)
- Utility / transmission owner
- NorthWestern Energy
- Connection point (POI)
- 100kV Roundup Substation
- Location
- Musselshell County, Montana
- Technology
- Wind: 70.0 MW
- Total requested
- 70.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- System Impact Study 9/27/2021; Revised System Impact Study 6/16/2022; Revised System Impact Study 2 10/1/2022; Correc
- Queue status
- Active
- Entered queue
- 15 January 2021
- Proposed online date
- November 2023
Location
Marker shows the centre of Musselshell County; the queue data does not give exact sites.
Other requests in Musselshell County
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem