United States › Grid › Interconnection queues › Indiana
SOLAR · MISOSolar project J2177, Tipton County
Solar project J2177, Tipton County is a 67.0 MW solar request in interconnection study in the MISO interconnection queue, in Tipton County, Indiana, connecting to DUKE ENERGY INDIANA.
Queue statusIn planning
- PlanningQueued Aug 2021 (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Oct 2024 (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- J2177
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- DUKE ENERGY INDIANA
- Connection point (POI)
- Tipton West 230 kV
- Location
- Tipton County, Indiana
- Technology
- Solar: 67.0 MW
- Total requested
- 67.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- Study Phase: DPP 2; Post GIA Status: Not Started
- Queue status
- Active
- Entered queue
- 9 August 2021
- Proposed online date
- October 2024
Location
Marker shows the centre of Tipton County; the queue data does not give exact sites.
Other requests in Tipton County
- Battery storage project J2232, Tipton CountyBattery storage · 100 MW · in study
- Onshore wind project G923, Tipton CountyOnshore wind · 200 MW · withdrawn
- Onshore wind project J054, Tipton CountyOnshore wind · 198 MW · withdrawn
- Solar project J1625, Tipton CountySolar · 150 MW · withdrawn
- Onshore wind project G952, Tipton CountyOnshore wind · 100 MW · withdrawn
- Solar project J1765, Tipton CountySolar · 93.2 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem