United States βΊ Grid βΊ Interconnection queues βΊ Indiana
SOLAR Β· MISOSolar project J1625, Tipton County
Solar project J1625, Tipton County is a 150 MW solar request withdrawn in the MISO interconnection queue, in Tipton County, Indiana, connecting to DUKE ENERGY INDIANA.
Queue statusWithdrawn / abandoned
- PlanningQueued Aug 2021 (completed)
- Withdrawn / abandonedSep 2024 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- J1625
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- DUKE ENERGY INDIANA
- Connection point (POI)
- Kokomo - Tipton 230kV Transmission line
- Location
- Tipton County, Indiana
- Technology
- Solar: 150 MW
- Total requested
- 150 MW
- Service type
- Network resource (NRIS)
- Study phase
- Study Phase: GIA In Process; Post GIA Status: Not Started
- Queue status
- Withdrawn
- Entered queue
- 20 August 2021
- Proposed online date
- August 2024
- Withdrawn
- September 2024
Location
Marker shows the centre of Tipton County; the queue data does not give exact sites.
Other requests in Tipton County
- Battery storage project J2232, Tipton CountyBattery storage Β· 100 MW Β· in study
- Solar project J2177, Tipton CountySolar Β· 67.0 MW Β· in study
- Onshore wind project G923, Tipton CountyOnshore wind Β· 200 MW Β· withdrawn
- Onshore wind project J054, Tipton CountyOnshore wind Β· 198 MW Β· withdrawn
- Onshore wind project G952, Tipton CountyOnshore wind Β· 100 MW Β· withdrawn
- Solar project J1765, Tipton CountySolar Β· 93.2 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem