ONSHORE WIND Β· MISOOnshore wind project G923, Tipton County
Onshore wind project G923, Tipton County is a 200 MW onshore wind request withdrawn in the MISO interconnection queue, in Tipton County, Indiana.
Queue statusWithdrawn / abandoned
- PlanningQueued Dec 2007 (completed)
- Withdrawn / abandonedMay 2009 (project stopped here)
- ConsentedMay 2009 (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- G923
- Grid region
- MISO (Midcontinent)
- Connection point (POI)
- Kokomo - Nobelsville 230 kV
- Location
- Tipton County, Indiana
- Technology
- Wind: 200 MW
- Total requested
- 200 MW
- Study phase
- SPA - SIS
- Queue status
- Withdrawn
- Entered queue
- 3 December 2007
- Agreement signed
- 19 May 2009
- Proposed online date
- November 2009
- Withdrawn
- May 2009
Location
Marker shows the centre of Tipton County; the queue data does not give exact sites.
Other requests in Tipton County
- Battery storage project J2232, Tipton CountyBattery storage Β· 100 MW Β· in study
- Solar project J2177, Tipton CountySolar Β· 67.0 MW Β· in study
- Onshore wind project J054, Tipton CountyOnshore wind Β· 198 MW Β· withdrawn
- Solar project J1625, Tipton CountySolar Β· 150 MW Β· withdrawn
- Onshore wind project G952, Tipton CountyOnshore wind Β· 100 MW Β· withdrawn
- Solar project J1765, Tipton CountySolar Β· 93.2 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem